Historical record of leak ID 12003261 (formerly 7374600, 45 PINE RD in Brookline, National Grid service area BROOKLINE)

History of leak ID 12003261 according quarterly leak reports
Leak IDEnd of QuarterLeak grade1Class/grade assigned2Measured leak extentRepair dateStatus4Notes from National Grid
Leak extent3Survey date
Loading…
1200326106/30/2025305/12/20221,184 sqft09/30/2024Pending
737460003/31/2025305/12/20221,184 sqft09/30/2024Pending
737460012/31/2024305/12/20221,184 sqft09/30/2024Pending
737460009/30/2024305/12/20221,184 sqft09/30/2024Pending
737460006/30/2024305/12/2022450 sqft01/11/2024Pending
737460003/31/2024305/12/2022450 sqft01/11/2024Pending
737460012/31/2023305/12/2022600 sqft03/16/2023Pending
737460009/30/2023305/12/2022600 sqft03/16/2023Pending
737460006/30/2023305/12/2022600 sqft03/16/2023Pending
737460003/31/2023305/12/2022600 sqft03/16/2023Pending
737460012/31/2022305/12/20221,792 sqft05/12/2022Pending
737460009/30/2022305/12/20221,792 sqft05/12/2022Pending
737460006/30/2022305/12/20221,792 sqft05/12/2022Pending
No records to display
Elimination plan for leak ID 12003261 according to annual Service Quality (SQ) reports5
Leak IDCalendar yearDate of SQ reportLeak grade1Class/grade assigned2Environmental ImpactIncluded in GSEPRepair context and/or timeframeRepair planned by6
Barhole readingLeak extentSurvey dateDesignated G3SEI
Loading…
7374600202402/28/2025305/12/20221,184 sqft09/30/2024Non-G3SEIGSEPThrough GSEP
7374600202303/01/2024305/12/2022600 sqft03/16/2023Non-G3SEIGSEPThrough GSEP
7374600202203/01/2023305/12/20221,792 sqft05/12/2022Non-G3SEIGSEPThrough GSEP
No records to display
Status of leak ID 12003261 according to SQ reports7
Leak IDCalendar yearDate of SQ reportLeak first identifiedLeak grade1Environmental Impact8RepairedRepair date
Barhole readingLeak extentDesignated G3SEI
Loading…
7374600202402/28/202505/12/20223N
7374600202303/01/202405/12/20223N
7374600202203/01/202305/12/20223N
No records to display
Footnotes:
1Grade (or class) is assigned initially, but may be up- or downgraded at a later date
2May be significantly later than the initial report date if the leak was ever up- or downgraded to a different class
3Reports before 2020 often report barhole reading, not leak extent
4Status is usually “Pending” until repair or elimination; details, if any, are in the Notes column
5G3SEI plans only provided starting in SQ report for CY 2019
6Planned repair date field is often empty in the absence of a concrete timeframe (e.g. “Through GSEP”)
7The SQ Report for CY 2014, which was the first to require leak reporting, collects unrepaired leaks from all preceding years
8Only provided from CY 2019 onward and only for repaired leaks, an elimination plan being unnecessary
Return to home page
Records last updated Wed, Aug 06 2025 04:00:12 PM EDT